Manchester Farmer's Market Phase III (20826)

Building Erection

Status

Accepting Bids

Prebid Date10/21/21 1:00pm

Bid Date10/28/21 2:00pm

Company & Contacts

St. John Engineering

(931) 728-2638

Location

Manchester, TN

In order to access bid documents, AGC East Tennessee Planroom Members are required to log in. Create a username and password by clicking “Register for an account.”

Deadlines are Central Time

Project Description: This project is part of a larger, on-going, multi-phase project. The work provided under this contract includes, but is not necessarily limited to: the erection of a pre-engineered metal building and the drying-in of the building shell. The building shall be erected on the existing concrete slab that was provided in a previous phase. The materials for the pre-engineered metal building were purchased under a separate contract, referred to as the metal building package.