Project Description: The project will include the construction of 24 inch Ductile Iron Pipe water main as shown on the drawings. The water main to be constructed for this project will start at a tie-in to an existing 24 inch DIP on Sheridan Avenue (Intersection of East Walnut Avenue) and tie into an existing 30 inch DIP water main on Keith Street (Intersection of East Morris) as shown on the plans. This includes, but is not limited to, installing a 24 inch DIP main, approximately 4,200 linear feet in length.