Pump Station Safety Improvements (20991)

Pump Stations

Status

Bidding Closed

Prebid Date5/24/22 10:00am

Bid Date9/8/22 2:00pm

Company & Contacts

City of Chattanooga

(423) 743-7230

Location

Chattanooga, TN

In order to access bid documents, AGC East Tennessee Planroom Members are required to log in. Create a username and password by clicking “Register for an account.”

Project Description: The project consists of three independently designed projects (Part 1, Part 2 and Part 3) being contracted as a single project.

Part 1: Brainerd Golf Course Pump Station Safety Improvements consists of constructing a precast concrete wet well containing two submersible pumps and appurtenances; associated electrical gear and flow meter; approximately 600 feet of 8-inch force main and 1,400 feet of 8-inch and 185 feet of 12-inch gravity sewer; power to the new pump station; and demolition of existing pump station.

Part 2: Murray Hills #5 and Brainerd Manor Selected Pump Station Safety Upgrades consists of modifications to two existing pump stations. The Murray Hills #5 Pump Station modifications consist of precast concrete wet well; submersible pumps and appurtenances; connection to the existing force main; valve vault including electromagnetic flow meter; and site improvements including a new security fence with gate, demolition of the existing can pump station, and repurposing the old wet well into a conventional manhole. The Brainerd Manor Pump Station modifications consists of a precast concrete wet well; submersible pumps and appurtenances; connection to the existing force main; valve vault including electromagnetic flow meter; site improvements including a security fence with gate, landscaping, demolition of the existing can pump station; relocation of the SCADA telemetry pole; and repurposing the old wet well into a conventional manhole.

Part 3: Hixson 2 Pump Station Improvements consists of s 40-ft deep precast concrete wet well with three submersible pumps and appurtenances; associated electrical gear and flow monitoring equipment. The project also consists of a valve vault and meter vault, both approximately 10 feet deep. Installation of 57 feet of 36-inch gravity sewer and 320 feet of 24-inch force main is included with pump station construction. Demolition of existing pump station will follow construction of new pump station.

General Contractors Bidding:

Wright Brothers Construction
J. Cumby Construction
Morgan Contracting