Alabama A&M Science Building (22322)
Includes the construction of a free-standing 3 story building that will house laboratory spaces for physics, biology, and chemistry. The project includes 2 large lecture halls with fixed seating and 1 lecture hall with non-fixed seathing and an operable partition. There are support offices on each floor for faculty. The project is approximately 123,500 square feet. The project includes an ICC 500 Strom Shelter in compliance with the State of Alabama. The primary structure is steel frame and elevated metal deck and concrete floors. Storm Shelter is 2-hour fire-resistance-rated load bearing 12" concrete masonry units.
Status
Accepting Bids
Bid Date | 5/22/25 2:00pm CDT |
Company & Contacts
Fuqua & Partners Architects
Lorri Thornton
256-534-3516
Location
Normal, AL
In order to access bid documents, AGC East Tennessee Members are required to log in. Create a username and password by clicking "Register for an account."
Planholders:
Brasfield & Gorrie
Contact: Sara Beth Wilcox
Phone: 205-612-1950
Email: jgorrie@brasfieldgorrie.com
Hoar Construction
Contact: Randy Ray
Phone: 205- 803-2121
Email: ray@hoarllc.com
Hensel Phelps
Phone: 615-338-9104
M. J. Harris Construction Services, LLC
Contact: Lincoln Compton
Phone: 205-380-6855
Email: lincolnc@mjharris.com
White-Spunner Construction, Inc.
Contact: Travis Deatherage
Phone: 251-471-5189
Email: travis.deatherage@white-spunner.com