Toyota Field Outfield Building Construction (22412)

Construction of a two-story building located along the outfield line adjacent to the third base foul pole and visitors’ bullpen. The building will provide approximately 8,200 gross square feet (gsf) at the Field Level. The program for Level 1 will include spaces typically expected to support the needs of a visitors’ locker room, including a training room, commissary, laundry, office, bullpen toilet, and storage and mechanical spaces. Level 2 will be approximately 7,400 gsf of Open-Air Concourse at the Main Concourse Level, along with associated vertical circulation - an open stair, elevator, and enclosed fire stair. Overall, the approximate building size is 15,600 gsf. The project will include utility work to support the building, expansion of the outfield concourse area, removal of temporary pedestrian egress scaffolding, removal of temporary bullpens (Alternate), and minor landscaping.

Status

Accepting Bids

Prebid Date 6/18/25 3:00pm EDT
Bid Date 7/17/25 3:00pm EDT

Company & Contacts

City of Madison
Alicia Walden  
2567725630

Location

Madison, AL

In order to access bid documents, AGC East Tennessee Members are required to log in. Create a username and password by clicking "Register for an account."

Bidders:

Butler Construction Company, LLC
Contact: Chad Butler
Phone: 256-380-0633

Dunlap Contracting
Contact: Cameron Grace
Phone: 256-883-7134

Ridgeline Construction LLC
Contact: Peter Craner
Phone: 256-325-1345

Wilcock Builders
Contact: William McCullough
Phone: 256-678-8351