Toyota Field Outfield Building Construction (22412)

Construction of a two-story building located along the outfield line adjacent to the third base foul pole and visitors’ bullpen. The building will provide approximately 8,200 gross square feet (gsf) at the Field Level. The program for Level 1 will include spaces typically expected to support the needs of a visitors’ locker room, including a training room, commissary, laundry, office, bullpen toilet, and storage and mechanical spaces. Level 2 will be approximately 7,400 gsf of Open-Air Concourse at the Main Concourse Level, along with associated vertical circulation - an open stair, elevator, and enclosed fire stair. Overall, the approximate building size is 15,600 gsf. The project will include utility work to support the building, expansion of the outfield concourse area, removal of temporary pedestrian egress scaffolding, removal of temporary bullpens (Alternate), and minor landscaping.
As Built (click to expand/collapse)
Plans (click to expand/collapse)