Cookeville Fire Stations II & III (21933)
This project includes two buildings, approximately 16,908 SF each, at North Washington Avenue & 18th Street and 438 Gould Drive, Cookeville, TN. The work includes but is not limited to building concrete, site concrete, concrete floor finishes, ground and polished concrete, masonry, metals, rough carpentry, casework/tops, insulation, fluid applied weather barriers, metal composite wall panels, cementitious fiber board, sheet metal and flashing, fire stopping, joint sealants, doors, frames, hardware, OH coiling doors, fourfold door systems, aluminum framed entrances and storefront, glazing, gypsum board and framing, acoustical tile ceilings, resilient flooring and base, epoxy floor coating, painting and coatings, plastic toilet compartments, corner guards, toilet accessories, fire protection cabinets, protective coverings, flagpoles, roller shades, plumbing, storm drainage, hvac, electrical, automatic transfer switch, communications, fire alarm, sitework, paving, turf and grasses, seeding, plants, fencing
Other Documents
(click to expand/collapse)
Name | Size | ||
Cookeville Fire Station II - Site 3 - ETS Preliminary Subsurface Report 062124 | 3.4 MB | ||
Cookeville Fire Station III Property Assessment - Jurisdictional Features Report | 3.3 MB | ||
Cookeville Police Dept Sample Subcontract | 1.7 MB | ||
Fire Station #3 - ARAP Application signed | 9.1 MB | ||
Fire Station #3 - ARAP NOC | 107.0 KB | ||
Fire Station #3 - NOC CGP | 130.6 KB | ||
Fire Station #3 - SWPPP | 14.2 MB | ||
Putnam Co Fire Sta III - ETS Prelim Report 112923 | 3.5 MB | ||
Sample COI | 613.2 KB | ||
W&O Sample PO | 955.2 KB |