Lodge 2nd Floor Uplift (22359)

A interior demolition and buildout of approximately 3,990 sf of office space including light demolition, millwork, caulking, storefront & glazing, metal stud framing, drywall, acoustical ceilings, painting, carpet, LVT, ceramic tile, toilet accessories, plumbing, HVAC Rework, and electrical.
Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25-09 Lodge 2025-04-23 permit drawings 4.8 MB