Carver Community Center Gym Floor Replacement (22438)
Work consists of: Removing existing multi-purpose athletic floor Preparing the concrete surface as specified by the manufacturer Sealing the existing concrete control joints Installing the finished floor surface Painting striping for basketball , pickle ball and volleyball
ITB
(click to expand/collapse)

Name | Size | ||
Carver Community Center Gym Floor Replacement | 99.5 KB |
Specs
(click to expand/collapse)

Name | Size | ||
Y-25-007 Specification Booklet 5-15-2025.cleaned | 8.2 MB |