Carver Community Center Gym Floor Replacement (22438)

Work consists of: Removing existing multi-purpose athletic floor Preparing the concrete surface as specified by the manufacturer Sealing the existing concrete control joints Installing the finished floor surface Painting striping for basketball , pickle ball and volleyball
ITB (click to expand/collapse)
Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Y-25-007 Specification Booklet 5-15-2025.cleaned 8.2 MB