Huntsville Police Department S.O.D. First Floor Modification (22497)
Selective demolition and renovation to create additional office and storage space. This includes the installation of metal stud partitions, rubber base, suspended acoustical ceiling system, modifications to mechanical, plumbing, fire suppression, electrical and communication systems, and limited scope of the second floor to include selective demolition and installation of life safety devices per electrical drawings, repairing finish surfaces including walls and ceilings.
Specs
(click to expand/collapse)

Name | Size | ||
HPD SOD Project Manual - 06.26.2025 | 21.9 MB |