Calhoun Community Clg Sparkman Building (22603)
The project focuses on improvements to the building’s Ground Floor restrooms and common areas by installing new wall, floor, and ceiling finishes, along with updated plumbing fixtures, toilet partitions, and accessories. The work includes removal and disposal of Asbestos Containing Material (ACM) as required by the site-specific asbestos abatement plans and technical specifications prepared by Terracon, and the removal and disposal of interior architecture and finishes, plumbing systems, and electrical & lighting systems as indicated on the demolition drawings and specifications prepared by Seay, Seay & Litchfield, and their consulting engineers.