Rural Solid Waste Used Oil Collection Facility (22662)

Installation of approximately 5,800 SF of asphalt pavement, 13,700 SF of gravel pavement, 112 FT of driveway culverts, 425 FT of chain link fence, and construction of a detention pond with associated outlet structure and hydrodynamic separator.
ITB (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
108-90 Adv For Bids 67.6 KB