Public Projects

Bids due in 16 days
12/11/25 10:00am CST
Cookeville High School Softball Indoor Hitting Facility (22838)
Bids due in 16 days
AEI Architects
Cookeville, TN
New Construction
Bids due in 51 days
1/15/26 2:00pm CST
RFP Construction Manager at Risk Dekalb County New Elementary School (22837)
Bids due in 51 days
Upland Design Group
Smithville, TN
Bids due in 8 days
12/3/25 11:00am CST
The Learning Tree - Rebid (22836)
Bids due in 8 days
Derthick, Henley & Wilkerson Architects
Dunlap, TN
Bids due in 22 days
12/17/25 2:00pm CST
Monument Sign Replacement (22835)
Bids due in 22 days
Wold Architects and Engineers
Franklin, TN
Monument signs replacement at multiple locations.
Bids due in 9 days
12/4/25 1:00pm EST
Walmart - Soddy Daisy (22834)
Bids due in 9 days
Jetton General Contractors
Soddy Daisy, TN
Bids due in 21 days
12/16/25 2:00pm CST
Big Springs Park East Expansion (22833)
Bids due in 21 days
City of Huntsville
Huntsville, AL
The work consists of creating an expansion of new park space within the Big Springs Park with concrete plazas, walls, a playground, seat walls, a pavilion and bathroom building, water features, public art walks (sidewalks), streetscape improvements as well as landscape and irrigation as well as all civil, architectural, and electrical associated with the project.
Bids due in 8 days
12/3/25 12:00pm EST
Lowe's Dayton (22832)
Bids due in 8 days
Prime Retail Services
Dayton, TN
Bids due in 14 days
12/9/25 2:00pm CST
VBC Site Power Enabling Package Phase 1 (22830)
Bids due in 14 days
City of Huntsville
Huntsville, AL
The Phase I Electrical Site Enabling project is the initial interim step to re-feed the Von Braun Center (VBC) with a primary 12,470V utility source from the north side of Clinton Street. This work is in preparation for the future Phase III Exhibit Hall Expansion (N.I.C.). This scope requires testing of the existing VBC medium voltage (MV) system—including switches and cabling—prior to back feeding the system from Huntsville Utilities (HU) at the Clinton Street location.
Bids due in 15 days
12/10/25 2:00pm CST
Shelbyville Readiness Center (22831)
Bids due in 15 days
Bauer Askew Architecture
Fayetteville, TN
Bids due in 21 days
12/16/25 10:00am EST
Water Treatment Plant Floride Improvements (22829)
Bids due in 21 days
CTI Engineers, Inc.
Charleston, TN