Lodge 2nd Floor Uplift (22359)

A interior demolition and buildout of approximately 3,990 sf of office space including light demolition, millwork, caulking, storefront & glazing, metal stud framing, drywall, acoustical ceilings, painting, carpet, LVT, ceramic tile, toilet accessories, plumbing, HVAC Rework, and electrical.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
1 1.6 MB
2 2.2 MB
3 2.2 MB
4 2.3 MB
5 2.3 MB
6 1.4 MB
7 1.3 MB
8 1.9 MB
9 1.1 MB
10 1.1 MB
11 1.1 MB
12 2.2 MB
13 2.2 MB
14 2.2 MB
15 2.2 MB
16 2.2 MB
17 2.3 MB
18 2.0 MB
19 2.7 MB
20 2.4 MB
21 2.7 MB
22 2.4 MB
23 2.9 MB
24 2.7 MB
25-09 Addendum 01 Narrative 460.7 KB
25-09 Lodge 2025-05-05 Addendum No 01 5.0 MB
25 2.4 MB
26 2.5 MB
27 2.4 MB
28 1.5 MB
29 2.0 MB
30 1.0 MB
31 1.7 MB
32 1.7 MB
33 1.7 MB
34 1.4 MB
35 1.1 MB
36 1.8 MB
37 1.8 MB
38 1.9 MB
39 2.0 MB
40 2.5 MB
41 2.1 MB
42 2.6 MB
43 1.9 MB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25-09 Addendum 02 Narrative 330.0 KB
25-09 Lodge 2025-05-08 Addendum No 02r1 5.0 MB