Tellico Plains WTP Clearwell and Chemical Feed Building (22504)
Project involves the construction of a below-grade clearwell located beneath a new Chemical Feed Building. The scope includes site preparation, grading, and installation of 8-inch ductile iron yard piping. A 30' x 50' masonry building will be constructed above the clearwell to house chemical dosing systems, which include metering and transfer pumps, flow monitoring systems, and SCADA instrumentation for remote monitoring and pump control.
Addendum 1
(click to expand/collapse)

Name | Size | ||
Addendum No. 1 C24044 - w Ltr of Trans | 264.6 KB |
Addendum 2
(click to expand/collapse)

Name | Size | ||
Addenda 2 WTP Clearwell Bid Set dwgs 07 25 2025 reduced size | 60.8 MB | ||
Addenum No. 2 C24044 - w ltr of transmittal | 367.0 KB |
Addendum 3
(click to expand/collapse)

Name | Size | ||
Addenum No. 3 C24044 - w Ltr of Transmittal | 185.9 KB |
Addendum 4
(click to expand/collapse)

Name | Size | ||
Addenda 4 WTP Clearwell Bid Set dwgs 08 04 2025 | 52.3 MB | ||
Addendum No 4 w ltr of trans | 735.6 KB | ||
Tellico Plains Clearwell GeoReport | 2.7 MB |