Tellico Plains WTP Clearwell and Chemical Feed Building (22504)

Project involves the construction of a below-grade clearwell located beneath a new Chemical Feed Building. The scope includes site preparation, grading, and installation of 8-inch ductile iron yard piping. A 30' x 50' masonry building will be constructed above the clearwell to house chemical dosing systems, which include metering and transfer pumps, flow monitoring systems, and SCADA instrumentation for remote monitoring and pump control.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No. 1 C24044 - w Ltr of Trans 264.6 KB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addenda 2 WTP Clearwell Bid Set dwgs 07 25 2025 reduced size 60.8 MB
Addenum No. 2 C24044 - w ltr of transmittal 367.0 KB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addenum No. 3 C24044 - w Ltr of Transmittal 185.9 KB
Addendum 4 (click to expand/collapse)