Tellico Plains WTP Clearwell and Chemical Feed Building (22504)
Project involves the construction of a below-grade clearwell located beneath a new Chemical Feed Building. The scope includes site preparation, grading, and installation of 8-inch ductile iron yard piping. A 30' x 50' masonry building will be constructed above the clearwell to house chemical dosing systems, which include metering and transfer pumps, flow monitoring systems, and SCADA instrumentation for remote monitoring and pump control.