Clearwell Repair Project (22535)

The Project consists of replacing the baffle system in the 0.5MG Clearwell at the Cleveland (Water Treatment) Filter Plant.
Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
202500317047__1_01 615.4 KB
202500317047__1_02 771.3 KB
202500317047__1_03 775.8 KB
202500317047__1_04 1.3 MB
202500317047__1_14 574.4 KB
202500317047__1_15 404.5 KB