Clearwell Repair Project (22535)

The Project consists of replacing the baffle system in the 0.5MG Clearwell at the Cleveland (Water Treatment) Filter Plant.
Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
K25002 CUA W3174X FY25 CFP 0.5MG Clearwell Repair Project Contract Documents and Specifications 5.7 MB