Gordonsville Wastewater Treatment Plant Modifications (22559)

The furnishing, installing, and testing of aeration blowers, sludge dewatering box, piping, electrical modifications, etc., including testing, bypass wastewater pumping, unclassified excavation, backfill, tie-ins, working in close proximity with other utilities and structures, restoration, and all other appurtenances and other work as shown on the Construction Drawings or indicated in the Contract Specifications.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No. 1 - 23137A 107.1 KB