Gordonsville Wastewater Treatment Plant Modifications (22559)
The furnishing, installing, and testing of aeration blowers, sludge dewatering box, piping, electrical modifications, etc., including testing, bypass wastewater pumping, unclassified excavation, backfill, tie-ins, working in close proximity with other utilities and structures, restoration, and all other appurtenances and other work as shown on the Construction Drawings or indicated in the Contract Specifications.
Plans
(click to expand/collapse)

Name | Size | ||
Gordonsville wastewater treatment plant plans | 1.4 MB |