Turnkey Installation of Photovoltaic Solar System and Battery Energy Storage System (22725)
The selected contractor will provide engineering, procurement, construction, testing, and commissioning of the integrated PV+BESS system, delivering reliable power to the campus under a long-term agreement. The system is expected to supply 100% of the University’s energy needs and provide uninterrupted power during outages or adverse weather events. The contractor will own and operate the system during an initial Power Purchase Agreement PPA term, after which the University may choose to assume ownership. This project aims to enhance campus energy resilience, achieve cost savings on electricity, and further the University’s efficiency and sustainability goals.
Status
Accepting Bids
Bid Date | 11/10/25 2:00pm CST |
Location
Dyer, AL
In order to access bid documents, AGC East Tennessee Members are required to log in. Create a username and password by clicking "Register for an account."