Turnkey Installation of Photovoltaic Solar System and Battery Energy Storage System (22725)

The selected contractor will provide engineering, procurement, construction, testing, and commissioning of the integrated PV+BESS system, delivering reliable power to the campus under a long-term agreement. The system is expected to supply 100% of the University’s energy needs and provide uninterrupted power during outages or adverse weather events. The contractor will own and operate the system during an initial Power Purchase Agreement PPA term, after which the University may choose to assume ownership. This project aims to enhance campus energy resilience, achieve cost savings on electricity, and further the University’s efficiency and sustainability goals.
Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Affidavit_Beason_Act 422.2 KB
Append_BESS2 7.1 MB
RFP_2_2k25A_Turnkey_Solar_PV_and_Battery_Energy_Storage_System_BESS_for_AAMU... 452.4 KB